I have fallen behind. With everything.
The garden is starting to give cherry, grape and pear tomatoes and the zucchini always stops producing half way through the summer. I have to brave the jungle of weeds to get to my plants. I used preen but it doesn't cover every weed out there.
Started in late April early May:
- 2.5" many trips around the world - top completed July 12th
- string quilt with scraps from seahawks fabric - for charity- top completed in early May, crib size
Started June or July
- Picking up the pieces string quilt - Half done
- 2 50" square charity quilts, need hand bound (4&5)
- 1 wheel chair size charity quilt, needs bound (6)
Finished:
- lined pouch for toys at church
- lined pouch for violin chin rest and pencils
- wheelchair quilt -donated
- throw quilt -donated
- crib quilt -donated
- Quilt guild Bicentennial quilt block
- "Mom's pride and joy" - twin quilt
- birthday turtle
- Chicken pin cushion
- Thread catcher
- Violin recital
- Bumble bee quilt
- charity quilt 4
- charity quilt 5
- charity quilt 6